Introduction

Tutorials

Data types and nodes

Reference

Installing GeoData Manager

Data integrity checks

These nodes are for checking well data.

There are three kinds of checks available:

Name Checks
Well Configuration The well data is consistent, the wells are properly defined and the calculated fields are calculated.
Well Dates If any test data for the well (for example a downhole PT test) is earlier than the Well Date.
Well Depths If any test data for the well (for example a downhole PT test) is above the top of the well or below the bottom of the well.

To check the well data:

  1. Navigate to the appropriate node: Well Configuration, Well Dates or Well Depths.

  2. Tag the wells to check (usually Tag All).

  3. Click Process.